News
» Go to news mainBoulden brick and Window construction
Posted by Stephanie Rogers on
June 28, 2019
in
News
Boulden will be undergoing a renovation this summer with the exterior brick being repointed, windows being replaced and the Pavilion will be painted.
The Contractor has indicated that work will begin work on June 27, 2019 to the west end of the building. There will be noise associated with the tools required to complete this work.
Thank you all in advance for your consideration and cooperation.
Recent News
- Balancing Boots and Books: Dr. Jolene Vermeulen’s life as a vet, farmer, and educator
- Chartwells Update
- Join the Residence Life team – Residence Life Don
- Rolling With Pride: ÕýÆ·À¶µ¼º½ Faculty of Agriculture celebrates love, community, and color in the Truro Pride parade
- Romblon State University Summer Enrichment camp 2025 comes to a close
- We came. We mooed. We conquered.
- Learning, growing, belonging at Master Gardener Field School
- Celebrating Women in Engineering