June 26-29th
Remove old windows in section B (Rooms 140, 142, 242, 246)
Prep openings for new window installation in rooms noted above
Miscellaneous joint cutting on exterior of building on daily basis
The classrooms above should be considered closed during this time frame.
July 4th-7th
Install new windows in section B- (rooms 140, 142, 242, 246)
Remove old windows in section C (rooms 254, 255,257, female wash room second floor
All classrooms in section B and C should be considered closed during this time frame.
Thank you for your patience and understanding,
Ìý
Recent News
- Balancing Boots and Books: Dr. Jolene Vermeulen’s life as a vet, farmer, and educator
- Chartwells Update
- Join the Residence Life team – Residence Life Don
- Rolling With Pride: ÕýÆ·À¶µ¼º½ Faculty of Agriculture celebrates love, community, and color in the Truro Pride parade
- Romblon State University Summer Enrichment camp 2025 comes to a close
- We came. We mooed. We conquered.
- Learning, growing, belonging at Master Gardener Field School
- Celebrating Women in Engineering